e-STS : Search Here

Showing posts with label Record Binding. Show all posts
Showing posts with label Record Binding. Show all posts

Friday, May 12, 2023

Guide for Doing a Course Project

Student Project Guide

The College Computer Science Students have to do a Project Work in their Course Curriculum for getting a Degree.  In between Semester the Students have to study a Software Technology like VB, ASP Dot Net, PHP, Android etc., to do a Project Work.   The Student Want to do a Mini Project and a Final Semester Project in any Software Technology.  In College and University the Students are assigned a Faculty as a Guide.

Project Guide

The B.Sc Computer Courses Students, Professor are allocated for the Student to do a Project Work.  The Student have to do a Project Work by Guide Instruction.  The College Guide first Instruction to the Students is to Study a Software Technology and to Select the Company.

Students Guide Are

  • College Guide and

  • Company Guide.

College Guide

The Students have to do the Project, the Company and Title of the Project is Selected by Guide.  The Project Step by Step Software System have to Develop.  In Between Project Duration the Student have to Prepare a Synopsis, System Background Study, Feasibility Study, Module Creation, System Design, Coding, System Testing, Implementation Plan etc have to Prepare.  The Project Review will be Conducted for the Students to check how the Students are doing a Project.  The One or Two Project Review are Given to the Students.

College Student Project Guide

Company Guide

The Student have to Select the Company for doing the Project. In Company a particular Staff want
to Guide for Doing for the Project Work.  So the Student will get the Knowledge of Real Time Projects. The Project Selection Confirmation Document want to Submit to the College Guide for Doing a Project.  The Student Existing System Data Collection have to Collect from the Company Guide.  Then the Feasibility Study and Module Preparation have to done.  Then the Project System have to Develop and the Solution is given by the Software Technology. At Last Project Completion Document are want to get from the Company with authorized Staff Signature.

The following are the Documents have to Prepare for Project Work which is Instructed by Guide
for the Developing System are.

Documents Prepared Are

  1. Synopsis,

  2. System Study,

  3. Modules,

  4. System Design,

  5. Software Coding,

  6. System Testing,

  7. Implementation Plan,

  8. ER Diagram,

  9. Data Flow Diagram,

  10. System Flow Diagram,

  11. Bibliography,

  12. Appendix,

  13. Front Page Preparation,

  14. Declaration Preparing,

  15. Signature Certificate Preparing,

  16. Acknowledgement,

  17. Index Page Preparing,

  18. Record Color Deciding,

  19. Number of Record Copies Binding,

All those Document of the Developing System of the Project are shown to the Guide and Verified for Record Preparation.

At Last the Record are Submitted to the College Department by Signature from the Guide, HOD and Principal.

In Project Viva Vice Student Developed System is given as PowerPoint Presentation to the Internal Guide and to the External Guide, in this the students are asked Question from the System Development of Project.

Student Project Record Documentation Preparation

Project Record Documentation Content

Project Documentation Record Work Content

The System is Developed Stage by Stage for every Module. For every Process in a Module Documentation are created. The Full Summary of the System Development are Documented for a Module. The System Design, Module Creation, System Testing, System Implementation. The Documentation are Created for the Following. 

In Project Work Duration following Documents have to Prepare in between times. 

  • Synopsis, 
  • Organization Profile, 
  • Background Study, 
  • Existing System, 
  • Limitation of the Existing System, 
  • Proposed System, 
  • Advantages of the Proposed System, 
  • Problem Formulation, 
  • Objective, 
  • Methodology, 
  • Platform Selection, 
  • Hardware Specifications, 
  • Software Specifications, 
  • System Analysis, 
  • System Analysis, 
  • Fact Finding, 
  • Feasibility Study, 
  • Technical Feasibility, 
  • Economical Feasibility, 
  • Operational Feasibility. 
  • System Design, 
  • Input Design, 
  • Output Design, 
  • Database Design, 
  • System Development, 
  • Module Description, 
  • Development Tools,
  • System Testing,
  • Testing, 
  • Verification and Validation, 
  • Unit Testing, 
  • Integration Testing, 
  • System Testing, 
  • Interface Testing, 
  • Black Box Testing, 
  • White Box Testing, 
  • System Implementation and Maintenance, 
    • System Implementation, 
    • System Maintenance, 
      • Corrective Maintenance, 
      • Adaptive Maintenance, 
      • Perfective Maintenance, 
      • Preventive Maintenance,  
  • Conclusion, 
  • Scope for Future Enhancements, 
  • Bibliography, 
  • Appendices, 
    • UML Class Diagram, 
    • Data Flow Diagram, 
    • Interaction Diagram, 
    • Use Case Diagram, 
    • Activity Diagram, 
    • Screen Shots.

After Preparing all those above shown Documents with Sentence, Paragraph Alignment, Font, Font Style, Font Size, Line Spacing, Table, Flow Diagram and all other Content Alignment. 

                                           Project Record Documentation Content
Front Page Content 

The Project Record Front Page Content want to Create. The Front Page must Contain an important Content. For example, Student Register Number, Degree Name, Title etc., The Following Areas have to Place. 

  • Project Title, 
  • Degree Name Specify, 
  • Submitted by, 
  • Register Number, 
  • College Logo, 
  • Department Name, 
  • University Name, 
  • Address, 
  • Submitting Duration Year.

Declaration 

The Declaration Page must contain an Project Title, Supervision Information, Signature Details, Place and Date are Specified here.  The Declaration Page should have 

  • Project Title, 
  • College Name, 
  • Supervision and Guidance Professor Name, 
  • Department, 
  • Address, 
  • Awarded Degree Program, 
  • Place, 
  • Date, 
  • Signature of the Candidate, 
  • Countersigned by 
  • Guide. 
  • Department, 
  • College Address.

Certificate 

The Certificate Page is an Important in Record Preparation.  In Certificate Page the Project Title, Degree Name, Guide Signature, Head of the Department Signature and all Important Details are Specified. The Certificate Page should have the following Area. 

  • Project Title, 
  • Awarded Degree Program Name, 
  • Project Work Done by Candidate Name, 
  • Candidate College Name, 
  • Department, 
  • Address, 
  • Awarded Degree Program. 
  • Staff in Charge Signature, 
  • Head of the Department Signature, 
  • Record Submitted University Examination Held Date, 
  • Internal Examiner Signature Space, 
  • External Examiner Signature Space.

Acknowledgement 

The Acknowledgement are a Full Summary of the Project Done. The Project Work Guidance Guide Name and all other Staff Supported Name have to Specify Here. The Project Develop Supported Person Name are as Follows. 

  • College Guide Name, 
  • Company Guide Name, 
  • Thanks to Friends, 
  • Parents Name etc., Have to Specify.
    • Finally All Documents are Taken to Binding. 
    • Front Page Color are Decided, 
    • Number of Copies of Project Record are Documented, 
    • The Signature want to get from Guide, Head of the Department
      and Institution Seal etc are Got and Submitted to the Department.

Most Recent